Dura Profile Mezzanines

Building a Mezzanine Floor System in 5 days using Composite Technology.

 

Please feel free to download a PDF version or Powerpoint presentation of the below case study.

 

GRP Mezzanine Floor Before

Before


  • Far Left of new Warehouse storage facility
  • Warehouse being cleared in preparation for
    new mezzanine storage area


GRP Mezzanine Floor Before

Before




GRP Mezzanine Floor Before

Before


  • Far right of proposed new storage facility


Day 1&2 – Erecting Structure

Day 1&2 – Erecting Structure




Day 1&2 – Erecting Structure

Day 1&2 – Erecting Structure


  • Image to show stainless steel heavy duty fixings
    to join column and beam


Day 1&2 – Erecting Structure


  • Main cross beam measures 11 metres with
    column supports at 2.2m in height
  • Spans set at 3m intervals to suit load
    requirements


GRP Mezzanine Floor Day 3

Day 3


  • Dura Slab Type 40 ready to lift into position to
    create rapid install mezzanine anti-slip flooring


GRP Mezzanine Floor Day 3

Day 3


  • Mesh flooring on right side is Dura Tread 38mm anti slip grating selected to allow more
    light on right side of mezzanine storage area


GRP Mezzanine Floor Day 3

Day 3


  • Flooring on left is Dura Slab Type 40 being slotted together and fixed into position
  • Each panel measures 3.66m in length,
    supported at 1.83m


GRP Mezzanine Floor Day 4

Day 4


  • Completed mezzanine anti-slip deck area


GRP Mezzanine Floor Day 4

Day 4




GRP Mezzanine Floor Day 4

Day 4


  • Handrailing now in position created using fibreglass omega, box and tubular sections


Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks


  • Far Left of new Warehouse storage facility
  • Warehouse being cleared in preparation for
    new mezzanine storage area


Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks




Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks


  • Far right of proposed new storage facility


Day 5 - Complete

Day 5 - Complete


  • Handrailing now in position created using fibreglass omega, box and tubular sections
  • Mid rail section now sprayed hi visibility yellow
    for maximum safety
  • Additional handrail supports added on right
    hand side for extra safe storage


Day 5 - Complete


  • Stair handrail added for maximum safety


Day 5 - Complete

Day 5 - Complete


  • Caution sign added in area where top rail and
    mid rail can be removed


Day 6 - In Operation


  • Fork Lift truck being used to off-load new stock
    items safely
  • This system protects staff from unnecessary
    manual handling and promotes safe handling of
    bulky and heavy items


Day 6 - In Operation

Day 6 - In Operation


  • Mezzanine storage area provides anti-slip
    surface for maximum safety no matter the
    temperature or conditions


Day 6 - In Operation

Day 6 - In Operation


  • This particular Mezzanine storage area has
    a capacity of 10 kN / m2 (calculated @ ½%
    deflection)